Installation & Commissioning

 
Project hand-over

After the Factory Acceptance Test (FAT), the automation system is installed and commissioned at the customer's site. With the assistance of Endress+Hauser engineers, the system is installed, cabled and commissioned in full compliance with industrial guidelines, e.g. ISO, FDA, GAMP, NAMUR etc.. It is handed over to the customer after successful completion of a Site Acceptance Test (SAT).

 
Deliveries
Installation and cabling
Loop tests
Commissioning, including system integration, device configuration and testing
Site Acceptance Test
Assistance with the systematic qualification of design (DQ), installation (IQ), operation (OQ) and performance (PQ)
Hand-over of complete documentation
Training of staff
 
 