Configuration data specified during the engineering stage is automatically transferred and recorded, avoiding error prone manual input. To commission an instrument, you have to load the correct DTM (Device Type Manager) for configuration or check against a copy of the original calibration certificate.
When calibrating your instrument, you might need a copy of the SOP (Standard Operating Procedure) of your instrument. You might also want to check previous maintenance schedules - all information is available to you at any time.
|